Select your language

Tips for installing a central vacuum system

Consejos para instalar sistema de aspiración centralizada

The first thing to do when carrying out an installation of this type is good planning, so as to ensure a perfect functioning of the system once it is installed. To do this we must make sure that we will get to vacuum all the corners of the house, counting on the necessary suction sockets, a number that will depend on the dimensions of the house and the length of the flexible.

The ideal would be to place the sockets in common areas, with the aim of facilitating access to several rooms with the same socket, which allows us to cover as much surface as possible.

Then you must think about the suction plant, for which you must take into account the dimensions of the house, which will influence the number of sockets that will have to be installed. For example, to cover an area of about 400 m2 you will need about 7 sockets, which will require a central of about 1,500 W of power, while if the surface is about 500 m2, the plant should have a motor of about 1,800 W to feed the 11 sockets that would be needed.

- Publicidad -

In addition to taking into account the power, other characteristics of the plants must be analyzed, such as whether they are capable of sucking solids and liquids, or if they have the automatic discharge mechanism. If it has these properties it means that it can vacuum floors even if they are wet or damp, while the automatic discharge prevents us from coming into contact with dust and dirt.

Consejos para instalar sistema de aspiración centralizada

After having chosen the most appropriate plant for our needs, we must choose the location of it. For this, the most advisable thing is to use a place in the house that is not used in the normal development of our life in the house, such as a garage, a closet, etc.

The chosen space must have a good air circulation, and otherwise to prevent the air from becoming vitiated, there must be a hole to the outside with dimensions greater than those of the tube that goes to the plant, so that it takes the air outlet of the same. This connection can be made with flexible had so that it is more comfortable, while the hole can be covered with a grid, in order to prevent the entry of small animals such as rodents.

For the installation of the suction plant, an electrical outlet appropriate to the consumption of the machine will be needed, which is located less than one meter from it. On the other hand, if the plant is located in a basement, the power outlet should be located one and a half meters from the ground, to avoid inconvenience in case of flooding.

Those plants with automatic discharge also require a water intake and drainage. The first should be 1/2 inch and should be less than half a meter from the machine, while the drain should have a diameter of about 50 millimeters.

Authors: raul

- Publicidad -

View original


No comments

• If you're already registered, please log in first. Your email will not be published.

Comments are closed

The comments for this content are closed.

CALA Awards extends its call until July 31

CALA Awards extends its call until July 31

Latin America. The call for the CALA AWARDS 2025, awards that celebrate excellence in technological integration in the region and delivered by AVI Latin America, is open until July 31.

K-array amplifiers now support NDI

K-array amplifiers now support NDI

Latin America. K-array announced a historic breakthrough in AV-over-IP integration. Through a simple software update, your entire line of Kommander amplifiers is now NDI compliant.

Panduit launches channel program in Brazil

Panduit launches channel program in Brazil

Brazil. Panduit expects to grow by 20% in the Brazilian market by 2025, doubling its revenue in 2023. One of the pillars to achieve this goal is the expansion of its channel network, and the...

Colombia, awarded for leadership in the meetings industry

Colombia, awarded for leadership in the meetings industry

Colombia. Colombia closed its participation in FIEXPO, one of the most relevant fairs in the meetings industry in Latin America, with great results by receiving four international awards that...

IoT and smart infrastructure, a new differential

IoT and smart infrastructure, a new differential

Argentina. Digital transformation is no longer limited to basic connectivity. Today, operators and service providers face the challenge of evolving towards smarter, more sustainable grids oriented...

Sennheiser celebrates 80 years in 2025

Sennheiser celebrates 80 years in 2025

Latin America. This year Sennheiser celebrates its 80th anniversary. While looking back on his history, Sennheiser reveals why this celebration isn't so much about the number of years, but more...

Microsoft inaugurates its first Datacenter Region in Chile

Microsoft inaugurates its first Datacenter Region in Chile

Chile. Microsoft announced the opening of its first Datacenter Region in Chile, a historic investment that supports the country's economic growth, technological innovation and social development.

Biamp presented the Parlé Presenter Lift system

Biamp presented the Parlé Presenter Lift system

Latin America. Biamp introduced Parlé Presenter Lift, which uses Parlé ceiling microphones to pick up and reinforce presenters' voices without the need for conventional podium, handheld or headset...

Building Automation Days arrives in Bogota

Building Automation Days arrives in Bogota

Colombia. On July 11th, the Tequendama Suites Bogotá Hotel will be the epicenter of automation and technology in Latin America with the Building Automation Days by KNX LATAM Colombia.

Christie offers solutions for the 2026 World Cup

Christie offers solutions for the 2026 World Cup

Latin America. Christie presented its new hybrid projector at InfoComm Show, a 40,000 lumen solution aimed at mapping and large projections.

Suscribase Gratis
Remember Me
SUBSCRIBE TO OUR ENGLISH NEWSLETTER
DO YOU NEED A SERVICE OR PRODUCT QUOTE?
LATEST INTERVIEWS
SITE SPONSORS










LATEST NEWSLETTER
Ultimo Info-Boletin